日韩AV片无码一区二区不卡,欧美人与动XXXXZ0OZ,西西人体44www高清大胆,国产av高清无亚洲

Language:CHINESESENGLISH

Home > News > News
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://jahzeh.cn
Beijing's first high-rise steel buildings in May next year, stay home
Beijing's first high-rise steel buildings in May next year, stay home It only took 75 days, 20-storey building of public rental Mentougou lead wire plant a "skeleton" where they stand. It is the "skeleton" is no longer likely to cause spilling conc...
2014/12/17
Steel construction steel prices ready era
Steel construction steel prices ready era "All steel construction Lijiang national secondary schools, secondary schools Yulong renovation project received by the community." In a recent meeting of the "2014 (second session) of the steel industry mul...
2014/12/13
Raw materials and finished steel works site acceptance
Raw materials and finished steel works site acceptanceI. General Provisions1. This chapter applies to the main material into the steel structure of each sub-project implementation site, zero (the Department) parts, finished parts, standard parts and ...
2014/12/13
Alloy structural steel engineering and metallurgical process characteristics
Engineering structural steel is used to manufacture a variety of projects specifically refers to a large class of steel structures, such as the manufacture of bridges, hulls, oil or mine steel, rail, pressure vessels, piping and building steel struct...
2014/12/13
Discussion: construction quality fireproof paint
Discussion: construction quality fireproof paint Construction Notes (a) fireproof paint 1, the substrate surface cleaning fireproof paint should serve as a rigorous inspection process. Remove dust, iron, rust, grease, and other substances hinder ad...
2014/12/10
Foshan Steel: Steel construction door optimal planning methods and procedures
Foshan Steel: Steel construction door optimal planning methods and procedures      Lightweight steel door frame structure with low cost, light weight, easy installation, short construction period, etc., so the rapid development i...
2014/12/10
Steel structure construction of the
Rivers and lakes known as "cannon" Ren This is true retreat.     Foshan Steel for Huayuan Property (600 743) Ren Zhiqiang, chairman of the "departure", the media will be positioned in 2014, "veteran developers" farewell the firs...
2014/12/10
Fireproof coatings market overview and its performance analysis
Fireproof coatings market overview and its performance analysis      World 200 meters high above 100 high-rise buildings in steel accounted for 79 percent. Since the reform and opening up, followed by strengthening international ...
2014/12/6
The most commonly used terms in the history of the whole building (and quickly Favorites bar)
The most commonly used terms in the history of the whole building (and quickly Favorites bar)First, building common noun1. What is the volume rate?A: The floor area ratio is the ratio of total floor area of the total land area. Generally expressed in...
2014/12/6
Steel cleanup
Steel cleanup      Steel shot blasting machine, the cleaning process can be controlled by electric speed roller conveyor feeding the steel structure or steel projectile body cleaning machine room area, its whole body on each side...
2014/12/3
Steel roofing planning focus to note
Steel roofing planning focus to note      1, steel roofing and roof purlins     Planning roof purlins and planning, now generally deploy isolation between purlins, etc., are such as roof purlins on cross-beari...
2014/12/3
What types of steel structures
What types of steel structures     Tall steel structure     Tall structure contains a tower, microwave towers, communication towers, high-voltage transmission line tower, petrochemical towers, atmospheric mon...
2014/12/3
page:37  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  31  32  33  34  35  36  37  38  39  40  41  42  43  44  45  46  47  pervious next  

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號